Abdullah Alwazani's profileHala Ashour's profile

Al-Bayader Energy Industry (Graduation Project)

The Proposed Project aims to present a solution for the energy problem we are suffering from. It also aims to promote sustainable and balanced interventions and find solutions .
The Site (Bayader Wadi Al Seer Industrial area) was chosen for its polluted environment and its waste disposal problem making it a perfect candidate for a new technology that produce energy from waste, and by that we place the solution in the problem area.
One of the projects main goal is to raise awareness at the public level, to achieve that we chose to redesign wadi al seer vegetable market and place the rest of the project near it, benefiting from it as an entrance for the project and serves as a provider of waste (raw material) to the proposed power plant, producing energy for the project and by that closing the cycle of waste and energy .
The other goal was to create a research hub were researchers can study and develop alternative energy sources.       
The exisitng market and a panoramic view for the site
The program
3D formation
Biomass diagram
Site plan
Section B-B
Aerial view
View from the entrance
view to the biomass path (gallery) on the lower level and the main entrance of the research mass
 
View to the market with the biomass elements penetrating it
View to the outdoor theatre, screen and the stack with the circulation around it 
 Eastern elevation view
View to the field (one of the biomass power sources)
 Western elevation view (The research mass)
Al-Bayader Energy Industry (Graduation Project)
Published:

Al-Bayader Energy Industry (Graduation Project)

Graduation Project

Published: