Project title: Assessment of Green Bearys Arena using 6D Building Information Modeling compared with conventional methods. (This project has been awarded “Best Project of the Year” at the state level by KSCST, IISc Bangalore).
Salient Features of the Project
A comprehensive, informative, and practical 6D clash-free BIM-Model is developed.
Time schedule, Material takeoff, and Cost estimation are done.
Optimal building orientation with minimal energy consumption is suggested, maximizing the use of natural resources.
Software used: AutoDesk Revit, Primavera, MS Office, Navisworks Manage, Green Building Studio