Geotechnical process control

Geotechnical process control
Client-Contractor Collaboration for Integrated TBM Process and Geotechnical process Control – Power Grid Cable Tunnels Singapore
For many years partnering has been a well-established principle for promoting a “best for project” culture within a construction contract. This endeavours to remove the adversarial nature of classical “engineer’s design” contracts by openly discussing issues which may impact on project performance and look to engineer ways to mitigate them within the terms of the contract. These discussions rely on information and often the data available to client, engineer and contractor is incomplete, different or ‘selectively’ chosen to support a particular point of view. On many contracts clients have implemented project wide systems either independent of the main contractor or as part of the contractor’s specification and these have seldom provided the common information base desired in order to facilitate the partnering approach. The Powergrid Cables tunnels in Singapore represent the first time that all contractual parties have contributed to the implementation of project wide data management systems. The paper will describe the systems; their technical capabilities within TBM process and geotechnical control, their implementation and the contractual framework origins within which they have been delivered.


Sing
Geotechnical process control
Published:

Geotechnical process control

Published:

Creative Fields